Posi-Joist vs I-Joist vs Solid Timber

Written By :
Category :
Design, News, Technical
Posted On :
Share This :
Stack of Posi-Joists with galvanised steel V-webs against a blue sky

What you need to know.

Every new floor has to carry more than people and furniture. Waste pipes, water, heating, cables and, more and more, MVHR ductwork all need a route through the floor zone.

How easily those services go in comes down to one early decision: which joist you specify.

Get it right and your trades fly through. Get it wrong and you are paying for notching, drilling, boxing-in and lost ceiling height.

Here is how the three most common options compare

Finished Posi-Joists stacked in the HETS factory
Posi-Joist with solid timber blocking between the steel webs
What’s the difference?

Solid timber joists:

The traditional choice. Every pipe or cable has to be notched or drilled, and Building Regulations guidance strictly limits both. Holes must sit on the centreline between 0.25 and 0.4 of the span, at no more than a quarter of the joist depth (capped at 65mm). Notches are limited to an eighth of the depth (capped at 35mm). On a 200mm joist that is a 50mm hole at most, so a 110mm soil pipe or an MVHR duct simply will not fit.

I-Joists (e.g. JJI-Joists):

Lighter and straighter than solid timber, with a thin board web. Holes can be cut in the web, but only in the sizes and positions set out in the manufacturer’s tables. Each hole means measuring, cutting and checking on site, and larger ducts often still end up dropped below the ceiling.

Posi-Joists:

Timber top and bottom flanges joined by the Posi-Strut steel web. The web is open along the full length, so services pass straight through with no cutting at all. A standard 202mm deep Posi-Joist gives 108mm of clear space between the flanges. 202mm joists can still be used, subject to checking and agreement with your design team.

IMPLICATIONS for your projects

Plan your services early.

Your choice of joist decides where every pipe, cable and duct can go. Choosing at design stage avoids costly changes once the floor is down.

Proven performance: Posi-Joist floors have tested fire solutions for 30, 60 and 90 minutes, and sit within Robust Details for separating floors.

No more notching: With Posi-Joists, your plumber and electrician thread services straight through. No drilling, no structural checks, no weakened joists.

MVHR made simple: Ventilation ducts run inside the floor zone instead of in bulky bulkheads. That keeps ceilings clean and protects room heights.

Faster on site: Joists arrive made to measure with up to 130mm trimmable ends. Less cutting, less waste, quicker first fix.

3D render of pipes and ducts running through the open webs of Posi-Joists
Finished Posi-Joists stacked ready for dispatch

What does this mean for you as our customer?

As a MiTek Posi-Joist designer, we design every floor in-house. Every order comes with design drawings and structural calculations for building control.

Tell us where your services need to run and we will lay out the joists to suit. You can walk through the whole floor before it is made with our free, interactive 3D model.

BUY JOISTS & METALWORK NOW!!

Check your span with the POSI-JOIST Span Calculator

Contact us to Get Started → free quote & 3D design

Final Thoughts

Hampshire Engineered Timber Solutions (HETS).

Solid timber and I-joists both have their place. But when a floor has to carry modern services, especially MVHR, nothing beats an open web.

Talk to our design team before your first fix, and let the floor do the hard work for your trades.

Close-up of galvanised steel V-webs on Posi-Joists

Frequently asked questions

Can you drill holes in solid timber floor joists?

Yes, but only within strict limits. Building Regulations guidance allows holes on the centreline between 0.25 and 0.4 of the span, no bigger than a quarter of the joist depth (max 65mm). Notches are limited to an eighth of the depth (max 35mm). On a 200mm joist that is a 50mm hole at most, too small for a 110mm soil pipe or an MVHR duct.

Do you need to cut holes in Posi-Joists for pipes and cables?

No. Posi-Joists have timber top and bottom flanges joined by MiTek’s Posi-Strut steel web, which is open along the full length. Pipes, cables and ducts pass straight through with no notching, drilling or cutting.

Which floor joist is best for MVHR ductwork?

An open web joist such as a Posi-Joist. The ducts run inside the floor zone instead of in bulkheads, so ceilings stay flat and rooms keep their height. I-joists only allow holes of set sizes and positions from the manufacturer’s tables, and larger ducts often still end up below the ceiling.

Who designs a Posi-Joist floor?

A licensed MiTek Posi-Joist designer. HETS, based in Hampshire just north of Portsmouth, designs every floor in-house and supplies design drawings, structural calcs for building control and a free interactive 3D model.

Related guides: Hangers, straps & strongbacks · Winter site storage for Posi-Joists · Posi-Rafters for flat & pitched roofs · How much do Posi-Joists cost?

Our online shop is LIVE!!

BUY JOISTS & METALWORK NOW!!

POSI-JOIST Span Calculator

Whats the maximum clear span for a posi joist?

Ready To Find Out More, Contact Our Design Team For A Free Quote And Interactive 3D Design

Hampshire Engineered Timber Solutions are a MiTek Posi-Joist manufacturer and benefit from the very latest industry leading design and layout software to create project specific designs.

Detailed output drawings can be provided for approval and manufacture, but it is the 3D viewer tools that really separates Posi-Joist from the rest.

Designs are shared via a free cloud based 3D viewing platform, allowing for a fully interactive 3D model of the floor or roof to be viewed on any internet enabled device. No apps are required, you will be sent a link to your model and simply click it to view in your browser..